Vedanta Power

Our Power Projects

Strategic thermal assets powering homes, industries and driving growth.

4,180 MW

Operationalised Capacity

4

Thermal Power Assets Nationwide

Built for Reliable Power Delivery

Vedanta Power’s thermal assets are built to deliver dependable baseload generation where it matters most. Spread across four key states, Punjab, Chhattisgarh, Andhra Pradesh, and Odisha, our power projects combine scale, fuel security, and disciplined operations to support utilities, industries and regional grids with reliable power.

A Multi-State Thermal Footprint

Talwandi Sabo Thermal Plant, Punjab
1,980 MW | Super-critical
PPA: Punjab State Power Corporation Limited (PSPCL)
25 years | 1,980 MW
Meenakshi Energy Ltd., Andhra Pradesh
1,000 MW | Sub-critical
PPA: Tamil Nadu Power Development Corporation Limited (TNPDCL)
5 years | 300 MW
Sakti Thermal Plant, Chhattisgarh
1,200 MW | Sub-critical
PPA: Tamil Nadu Power Development Corporation Limited (TNPDCL)
5 years | 200 MW
Jharsuguda Thermal Plant, Odisha
600 MW | Sub-critical
PPA: Grid Corporation of Odisha (GRIDCO)
25 years | 600 MW
Talwandi Sabo Thermal Plant, Punjab
1,980 MW | Super-critical
PPA: Punjab State Power Corporation Limited (PSPCL)
25 years | 1,980 MW
Meenakshi Energy Ltd., Andhra Pradesh
1,000 MW | Sub-critical
PPA: Tamil Nadu Power Development Corporation Limited (TNPDCL)
5 years | 300 MW
Sakti Thermal Plant, Chhattisgarh
1,200 MW | Sub-critical
PPA: Tamil Nadu Power Development Corporation Limited (TNPDCL)
5 years | 200 MW
Jharsuguda Thermal Plant, Odisha
600 MW | Sub-critical
PPA: Grid Corporation of Odisha (GRIDCO)
25 years | 600 MW
Our Power Footprint Across India

Vedanta Power’s thermal projects are positioned to serve diverse regional power needs through strong grid connectivity, fuel access and long-term offtake arrangements. 

Power Plant
📍 Mansa District, Punjab, India

Talwandi Sabo Thermal Plant

North India’s largest private thermal power asset, built for uninterrupted, large-scale operations.

  • Supplies contracted power to Punjab State Power Corporation Limited (PSPCL).
  • Supports ~35% of Punjab’s power needs.
Units 3×660 MW
Super-critical 1,980 MW
Learn More →
MEL Plant
📍 Nellore District, Andhra Pradesh, India

Meenakshi Energy Limited

A rapid turnaround anchored in speed, scale and execution strength.

  • Transitioned from import dependence to secured domestic coal linkage.
  • Stabilised to full 1,000 MW operational capacity within two years of acquisition.
Units 2×150 + 2×350 MW
Sub-critical 1,000 MW
Learn More →
VLCTPP Plant
📍 Sakti District, Chhattisgarh, India

Sakti Thermal Plant

From revival to growth engine, reclaiming stalled capacity through disciplined execution.

  • One Unit of 600 MW operational within three years of acquisition.
  • Advantage of fuel proximity.
Units 2x600 MW
Sub-critical 1,200 MW
Learn More →
MEL Plant
📍 Jharsuguda District, Odisha, India

Jharsuguda Thermal Plant

A dedicated state-linked power asset delivering reliable baseload supply.

  • Long-term contracted supply to GRIDCO.
  • Pithead advantage with strong domestic coal linkages.
Units 1×600 MW
Sub-critical 600 MW
Learn More →

Scaling with Discipline

From a single-asset base to a multi-state power portfolio, Vedanta Power has expanded through strategic acquisitions and operational turnarounds.

600 MW
FY'12
Jharsuguda Thermal Plant
Commissioned
2,580 MW
FY'17
Addition of
Talwandi Sabo Thermal Plant
4,180 MW
H1 FY'26
Operationalisation of Meenakshi Energy Ltd. and Sakti Thermal Plant Unit - 1

Driving Responsible Operations

Our thermal power projects are operated with focus on safety, environmental stewardship and operating responsibility.

Biomass Co-Firing
5%
Biomass Co-Firing at Talwandi Sabo Thermal Plant
Saline Water Usage
100%
Saline Water Usage at Meenakshi Energy Ltd.
Ash Utilisation
100%
Ash Utilisation Across Key Assets